Boiler making

In boiler making the date hangs on the documentation, not on the steel. We supply boiler components to drawing – with the certificate acceptance demands and the marking that saves time on site.

EN 12952 / EN 12953To drawingWith certificate
EN 12952 / 12953
Code
to 620 °C
with P91
3.1 / 3.2
Certificate to EN 10204
by item number
Marking
Materials

Typical materials

The grade follows medium, temperature and pressure. The list below is a selection, not a limitation – we supply the grade that design and specification call for. A data sheet exists for every grade.

Codes

Standards and codes

Standards and codes
AreaCode
Water-tube boilersEN 12952, part 3 design and calculation
Shell boilersEN 12953, part 3 design and calculation
Pressure equipmentDirective 2014/68/EU, category by pressure and volume
MaterialsEN 10216-2 seamless creep-resistant, EN 10217-2 welded, EN 10028-2 plate
WeldingEN ISO 3834-2, procedures to EN ISO 15614-1, welders to EN ISO 9606-1
EvidenceEN 10204 certificate 3.1 or 3.2, weld maps, inspection records
Focus

Typical tasks

Tube set for the outage

The shutdown is on the clock. Boiler tubes arrive cut to length, bevelled and marked by item number – on site people erect, they do not sort.

New build on a schedule

Headers, tube sheets and tube banks interlock. We match delivery dates to your erection sequence instead of dropping everything at once.

Material evidence without a gap

Heat marking is transferred before cutting and reapplied to every section. Each piece stays linked to its certificate.

Choosing the creep-resistant grade

From 16Mo3 to P91 the design temperature decides. We settle the grade with you and supply the data sheet along with it.

FAQ

Boiler making – frequently asked questions

EN 12952 or EN 12953 – which applies to us?

EN 12952 covers water-tube boilers, where the water is inside the tubes and the flue gas passes outside. EN 12953 covers shell boilers, such as the classic three-pass boiler. The construction decides, not the size.

When is a 3.2 certificate needed instead of 3.1?

When an independent body carries out acceptance – a notified body, an expert or the purchaser’s representative. The 3.1 is issued by the works itself. The difference costs time, so it belongs in the order, not in final acceptance.

Up to what temperature does 16Mo3 serve?

In practice to about 530 °C. Above that creep strength falls off markedly and 13CrMo4-5, 10CrMo9-10 or, at high parameters, X20CrMoV11-1 and P91 come into question. The design governs, not rules of thumb.

Can you deliver in stages following the erection sequence?

Yes, and in boiler making that usually makes more sense than one complete delivery. Tell us the erection order and we split the deliveries accordingly – it relieves your lay-down area on site.

What do you need for a quotation?

Boiler type and code, drawing or parts list, tube sizes and wall thicknesses, material grades, the marking you want, the date and the required certificate to EN 10204.

Enquiry

Send your drawing – we will clarify the rest together

A drawing, bill of materials or short description is enough to get started. If already available, the following details help us prepare your quotation quickly.

  • Drawing or parts list per item
  • Material and wall thickness, or design data PS and TS
  • Code: EN 12952, EN 12953 or AD 2000
  • Quantity, price breaks and erection sequence
  • Certificate 3.1 or 3.2, PED category and module

Read more in our article: EN 12952 or EN 12953? Boiler standards and materials at a glance

Boiler making supply